Adapting for scale: Experimental Evidence on Technology-aided Instruction in India
Muralidharan, K., & Singh, A. · 2025
Current published assessment
Assessment status: Not yet compared
The published assessment remains the archive’s current judgment. Stored model readings are preserved separately and never replace it automatically.
There are multiple stored readings, but no claim-by-claim comparison has been recorded.
Bottom line
Current archive record
An adaptive math and Hindi program called Mindspark was moved into 40 government schools in India, where it replaced part of ordinary class time rather than adding to the school day. Students still learned more than students in similar schools without it. For the length of time each ran, the gains were much smaller than in an earlier, small after-school trial, but they did not disappear.
Read the full explanation
What was compared
Researchers used a lottery to pick 40 government schools in Rajasthan, India, to get computer labs running Mindspark, an adaptive learning program for math and Hindi. Another 40 schools carried on as usual. About 6,500 students in grades 1–8 used the program each year.1
No time was added to the school day. Lab periods took over 6 of the 48 periods in each week, mostly from regular math and Hindi lessons. The study therefore tests whether the software makes an existing hour of school teach more.2
What happened
After 18 months, students in the program schools scored 0.22 standard deviations higher in math and 0.20 higher in Hindi than students in the comparison schools.3 A standard deviation measures how spread out students' scores are, which is how researchers put different tests on one scale (see effect size). As a sense of scale, students in the comparison schools improved by 0.47 standard deviations in math and 0.31 in Hindi over the same 18 months through ordinary schooling. The authors describe the program's effect as a 50–66% increase in how much students learn from the same school time.4
Students who logged more time on the platform gained more, in direct proportion. Schools were assigned by lottery, but the amount each student used the program was not, so this is an association, not proof that extra time caused the extra gains. The authors suggest that logged time could be a cheap way to check how well the program is being run in future expansions. The record concludes that at scale, how well schools run the program limits results more than the software does. Because usage was not assigned by lottery, that conclusion rests on this association.
Smaller than the earlier trial, but not gone
This study follows up an earlier Mindspark trial in Delhi. This site's record for the study describes that trial as the strongest positive result in education-technology research. In Delhi, 619 volunteer students went to an after-school center in addition to their regular school day, and they gained 0.37 standard deviations in math in 4.5 months. Here, the math gain after about six months was 0.15. The same record puts the effect at scale, per unit of exposure, at roughly a quarter of the Delhi estimate.5 Treat that as an approximate comparison: the record does not show how it was calculated, and the figures on this page do not work back to a single ratio. The month figures shown here compare calendar periods, and the two programs ran on different schedules. Delhi's sessions were extra time on top of the school day, while here they replaced existing lessons. So these figures do not show how much of the shrinkage comes from scaling up alone.
This is an example of efficacy-to-effectiveness decay: a program that did well in a small, carefully run trial produces smaller results when run the ordinary way across many schools. Here the effect shrank but did not vanish. That makes these results the more realistic figures to expect from adaptive software used during the school day.
Costs and limits
- Class time was given up. Lab periods took about 25% of weekly math and Hindi time in grades 1–5 and 40–50% in grades 6–8. Teachers had to cover the required grade-level curriculum in noticeably less time. The paper names this as a real cost of adjusting.6
- The schools were larger and better resourced than stand-alone primary schools. These were large "Adarsh" government schools covering grades 1–12, with more resources than stand-alone primary schools. They are the kind of government school most likely to run equipment-heavy education technology.
- Assigning schools by lottery supports a cause-and-effect reading. It does not guarantee the two groups were exactly alike or remove every bias. Test scores were collected in the same way in both groups, and similar shares of students dropped out of testing in each.7
- The paper had not been peer-reviewed when it was read. It was still a working paper, and its quality grade of A was recorded with that caveat.8
- The software company had a stake in the result. The company received outside funding to develop the in-school version being tested, and the academic authors designed that version together with the company before evaluating it.9
Footnotes
-
A randomized controlled trial that assigned whole schools (40 program, 40 comparison), with schools paired before the lottery. Pre-registered (AEARCTR-0002546). Test-score analyses cover 7,994 students at the first-year endline and 8,733 at the 18-month endline. Source: Muralidharan & Singh, NBER Working Paper w34205. ↩
-
The 6 of 48 weekly periods are 12.5% of all classroom time. Head teachers chose the details. In primary grades the replaced time was mostly the same subject; in middle school about half came from math and Hindi and the rest from other subjects and remedial instruction. The regular teacher went to the lab with the class, and where computers were short, two students shared one. ↩
-
Intention-to-treat estimates, with standard errors clustered at the level of the school pairs. Math +0.22 (SE 0.036, p<0.01): grades 1–5 +0.15 (SE 0.054), grades 6–8 +0.25 (SE 0.038). Hindi +0.20 (SE 0.032, p<0.01): grades 1–5 +0.20 (SE 0.043), grades 6–8 +0.15 (SE 0.036). The research team designed the tests and gave them in class at baseline (July 2017) and each February. Scores were linked across rounds and grades and scaled to comparison-group grade 5 students at baseline. ↩
-
Calculated against the comparison group's own gains, the effect rows give a 47% increase for math (100% in grades 6–8) and 65% for Hindi. The pooled math figure of 47% falls below the 50–66% range the authors give, and the source does not explain the difference. ↩
-
The Delhi trial was Muralidharan, Singh & Ganimian (2019), with the same product, lead authors and vendor. It found +0.37 math and +0.23 Hindi after 4.5 months. In this study's first year, math was +0.15 (SE 0.03, p<0.01) and Hindi +0.11 (SE 0.03, p<0.01). The record's first-year effect row describes this as under half the Delhi size over a slightly longer period, and without the extra instructional time Delhi added. The record does not reconcile this with its "roughly a quarter" figure. The results also reproduce Banerjee et al. (2007), which found that in-school computer-assisted learning in India improves math, and the pattern that gains are aimed below grade level. ↩
-
The paper names the loss of time for covering the grade-level curriculum as an adjustment cost. ↩
-
The study found no differential attrition, meaning dropout from testing did not differ between the two groups. Students absent on test day were tracked to their homes. ↩
-
NBER Working Paper w34205, September 2025, revised November 2025. The numbers come from the full text. ↩
-
Run in partnership with the Government of Rajasthan and Educational Initiatives (EI), the software company. EI staff gave operational support but are not authors. EI received Global Innovation Fund money to develop the in-school model. The evaluation was written by researchers at UCSD and the Stockholm School of Economics and funded by the RISE Programme (FCDO, DFAT, Gates Foundation). The archive classes the study as independent because the company did not run or write the evaluation (see evaluator independence). ↩
Effect size (g, d)
An effect size states how big a difference is in units of the spread of scores, so results from different tests can be compared. A g of 0.4 means the treated group's average sits 0.4 standard deviations above the comparison group's — enough to move a median student to roughly the 66th percentile. (g and d are near-identical variants; g corrects a small-sample bias.)
Rough anchors: 0.1 is small and hard to distinguish from noise in most classroom studies; 0.2–0.4 is a solid, real intervention effect; above 0.6 is rare in well-controlled trials of school-age academics and deserves suspicion before celebration.
Two cautions. The same true improvement yields a bigger number on a narrow researcher-built test than on a broad standardized one (see measure alignment). And an effect measured the week treatment ends usually shrinks by follow-up (see fadeout) — so a headline number without its test and its timing is not yet information.
Efficacy-to-effectiveness decay
An education program's measured effect usually shrinks each time it is evaluated by people with less stake in the result, and shrinks again when it is run at scale. This archive records the pattern as: developer-led +0.21, independently evaluated 0.10, at scale −0.02. It is the single most repeated finding here.
The reason is not fraud. A program's inventor runs it in a handful of friendly schools, trains the teachers personally, and often writes the test. An independent team runs the same program without the inventor in the building. A government then buys it for four hundred schools whose staff turn over, whose fidelity to the manual varies, and who were not chosen for enthusiasm. Each step strips away a condition that was quietly doing part of the work.
Thinking, Doing, Talking Science is the cleanest illustration, because the ruler never changed. Evaluated three times on the same instrument, it returned +0.22 in the efficacy trial, +0.01 in the effectiveness trial, and +0.02 in the replication — a collapse of roughly twentyfold with no change of measure at all. That last detail matters: this is a separate problem from measure alignment, and correcting for measure type alone does not remove it.
Every source here therefore records who evaluated it — independent, developer-involved, or developer-led — as a structured field rather than a remark. A discount that large has to be visible to the reader and to the confound filter, not buried in prose. The practical reading: a promising pilot is not evidence that a program works, it is evidence the program has not yet been tested properly.
Randomized controlled trial (RCT)
A randomized controlled trial assigns participants or groups to conditions by chance. Random assignment makes the groups comparable on average, so later differences can more credibly be attributed to the treatment.
Differential attrition
Attrition is the participants a study loses before it ends. It becomes differential when the two arms lose different people — and that quietly undoes what randomization bought. Once the groups being compared at the end are not the groups that were randomized at the start, the comparison is observational again, whatever the design was called.
The damage runs in whichever direction the dropouts create. A tutoring trial whose weakest students find the sessions punishing and stop attending ends up comparing its survivors against an intact control group, and reports a gain that is partly just the removal of low scorers. A demanding program that loses uncommitted families in the treatment arm produces the same artifact.
What makes it dangerous is that the overall rate looks reassuring. Ten percent lost from each arm is usually fine; ten percent from one arm and two from the other is a problem even though the total is modest. The question is never how many left, but whether the leavers differed — which is why an intention-to-treat analysis, keeping everyone in the arm they were assigned to, is the honest default.
This archive treats attrition as grade-modifying: a randomized trial with serious differential attrition does not keep a top grade simply for having randomized. It is also one of the specific things an abstract cannot tell you — abstracts carry no attrition table — which is why a source graded from the abstract alone is recorded here as debt rather than as a neutral state.
Evaluator independence
Evaluator independence records whether the people judging a program are separate from the people who developed or delivered it. Independence reduces one source of bias; it does not by itself make a study well designed or correct.
Results
- Result
+0.22 (SE 0.036, p<0.01). Primary grades 1-5 +0.15 (SE 0.054); middle grades 6-8 +0.25 (SE 0.038). Control-group gain over the period was 0.47 SD, so the treatment effect is a 47% increase in learning per unit time (and a 100% increase in grades 6-8).
Reported as: SD
Compared withbusiness-as-usual
Timing18 months (endline February of year 2)
Technical details
- Measure
- researcher-designed
- Measure origin
- Not recorded
- Horizon
- end-of-treatment
- Outcome class
- domain-skill
How the study worked
The recorded sample, comparison, methods, and practical details.
Sample
Who or what was studied
How the study worked
How much confidence should we place in this?
Limits of the research itself, separate from checks on this interpretation.